The project
Simon Hegele was founded in 1920 and is today an internationally active, highly specialized logistics and service provider with over 50 locations worldwide. The company offers customized logistics services for customers in the pharmaceutical, healthcare, industrial and retail sectors.
A warehouse at the Karlsruhe site was to be converted to meet GSP/GDP requirements for customers from the pharmaceutical industry. A special conversion such as this requires a great deal of GMP expertise. This was a new field of activity for Simon Hegele, so the company looked for experienced partners: Testo Solutions and Testo Industrial Services.
The focus was on compliance with the requirements in GDP-regulated areas to ensure the quality of the stored products.
Testo Solutions GmbH provided the hardware and software for the project. As a service provider for quality assurance, Testo Industrial Services GmbH provided the experts for the calibration/qualification.
The collaboration between the customer, Testo Solutions and Testo Industrial Services ran smoothly. Communication was clearly structured via a central contact person for each company and any questions that arose could be resolved quickly.
The aim of this project was the rapid conversion of an existing warehouse with the implementation of all relevant quality assurance measures into an air freight and GDP?compliant area for the deep-freeze storage and worldwide distribution of pharmaceutical products.
Key activities included the commissioning of four storage areas, the implementation of warehouse qualification with the necessary metrological services, the installation and calibration of the monitoring system and its validation.
In addition to the new warehouse areas and the newly procured freezers, the testo Saveris 1 monitoring system was also to be used to monitor the transportation of the pharmaceutical product outside the freezers. Special transport carts were integrated into the Saveris system for this purpose.
For Simon Hegele, a smooth process was particularly important, especially in the event of last-minute changes to the timeline. The clear definition of responsibilities and a limited number of contact persons on the part of the service provider/manufacturer was essential in order to keep communication costs to a minimum, as the stocks of existing customers were to be repositioned during ongoing operations in the final phase.
The compliant deep-freeze storage of pharmaceutical products in the 1,700 UTK freezers at Simon Hegele is constantly checked by the testo Saveris 1 monitoring system. The optimum temperature for the products is -75 °C, with a temperature corridor between -85.4 °C and -45 °C.
The specialists from Testo Solutions installed the system on site. The components are one sensor per freezer, one base station and the appropriate software. Live monitoring of the temperature and technical conditions is supported by an alarm system and automatic monthly reporting including user-specific report generation.
The testo Saveris 1 detects technical faults, as well as temperature undershoots/overshoots, and issues an alarm message. The system also monitors the indoor climate in the warehouse with constant recording of temperature and humidity values. A radio network was set up in the warehouse specifically for the transmission of messages, via which gateways and loggers, for example, communicate.
The experts from Testo Industrial Services took over the calibration of the 1,700 sensors as well as the prescribed summer and winter mappings in the warehouse to determine the standard-compliant limit values for the qualification. The team then carried out the qualification of the warehouse and validated the monitoring system, including the sensors. Together with Simon Hegele's contact person, the experts also defined customized alarm and escalation levels for the messages from the monitoring system and configured the system.
Close consultation and coordination:
Technical project planning and design of the monitoring system and advice on the technical infrastructure such as servers, IT and load simulations
Before the purchase decision:
Installation of a pilot system to demonstrate the functionality to the customer
Installation and commissioning
of the complete hardware of the monitoring system and the configuration of the software system
Final acceptance of the system
by means of a site acceptance test based on the customer's specifications
User training
tailored to the customer
Comprehensive individual support concept
including help desk, hotline and technical maintenance
Webinar recommendation
You can gain deeper insights into this success story in our webinar.
Watch it now!
Conceptual design and consulting on GDP-relevant topics such as calibration, qualification and validation
Flexible and efficient GxP services team on site
Comprehensive project management taking into account initial calibration, warehouse qualification and computer system validation
Coordination and implementation of the initial calibration of 1,700 sensors over a period of 4 weeks
Preparation of qualification documentation from risk analysis onwards Service provided by Testo Industrial Services
Implementation of the installation qualification of the warehouse areas including the ventilation system
Carrying out warehouse qualification including empty chamber mappings (OQ mappings) and mappings in summer and winter in loaded condition (PQ mappings)
Conceptual design of a recalibration strategy for the built-in sensors
Introduction of the holistic test equipment management
Testo Industrial Services
Our partner in this project was Testo Industrial Services.
Here you can find more information about the service portfolio for quality assurance measures in GxP-regulated areas.
Markus Henn
Head of Central Project Management
Simon Hegele Company for Logistics & Service mbH